ADU electrical

ADU electrical in Irvine and Orange County

Building an ADU or converting a garage? The electrical plan decides whether your existing service can carry a second home. We plan it, wire it and get it through inspection.

  • Licensed C-10 · CSLB Lic. #1161594
  • Permits & inspection handled
  • Licensed C-10 Electrical ContractorCSLB Lic. #1161594
  • You talk to Masonthe licensed owner, from the first call to the last
  • Residential & commercialhomes, condos, offices, retail
  • Permits handledwe pull them and meet the inspector

Can your service handle an ADU?

An ADU adds a kitchen, a bathroom, heating and cooling, and maybe an EV charger. Many existing homes don't have the capacity for that without changes. We start with a load calculation, then recommend the simplest option that works: a subpanel from your existing service, a service upgrade, or a separate meter coordinated with the utility.

ADU electrical services

  • Load calculations for the main house and the ADU together
  • Main panel and service upgrades
  • Subpanels and feeders to detached ADUs
  • Separate-meter coordination with Southern California Edison or SDG&E
  • Complete rough-in and finish wiring: outlets, lighting, appliances, HVAC, water heaters
  • Garage conversions and junior ADUs (JADUs)
  • EV charger and solar-ready provisions
  • Working alongside your ADU builder, architect or general contractor

How it works

  1. Early review.

    Share your plans (or ideas). We check your service capacity before design is final.

  2. Written proposal.

    Scope, phases (rough-in and finish) and price.

  3. Permits and utility.

    We coordinate electrical permits and any utility work.

  4. Rough-in, inspection, finish.

    On schedule with your builder, inspected at each stage.

What affects the cost

  • Attached, detached or garage conversion
  • Distance from the main panel (trenching may be needed for detached units)
  • Whether a service upgrade or separate meter is required
  • Size of the ADU and its appliances (all-electric, heat pump, EV)

Common questions

Do I need a separate meter for my ADU?

Not always. Many ADUs run on a subpanel from the main service. A separate meter is an option when the existing service is too small or you want separate billing. It involves the utility and takes longer. We'll help you compare.

When should I bring in an electrician?

Before your plans are final. The electrical capacity can change the design and the budget.

Do you work with ADU builders?

Yes. We can be your builder's electrical sub, or work directly for you.

Need an electrician? Let's talk.

Call or text Mason directly. Describe the job (a photo helps) and get a clear answer on what it needs and what it costs.

  • (949) 424-2525
  • Mon–Fri, 7 AM–6 PM; Sat, 8 AM–2 PM; Closed Sunday
  • Serving Irvine and all of Orange County